The Plumber is Done!

P1020069Finally!

Now we can start work on:

- tiling the floor
- electrical work for sauna
- painting the foundation wall
- replacing the light fixture
- repairing the drywall
- painting the walls
- installing trim
- installing sauna



P1020078New shutoff valve

This one is much nicer than the old one.

Also it's located inside the wall instead of sticking out of the floor.

We'll add an access panel later.

P1020072The hole awaiting inspection.

I had been hoping to pour the concrete for the hole this evening. I forgot that we couldn't do it before the inspector comes on wednesday. Maybe we'll try to tile around that area.

Well, I'm off to see how much of the vinyl tile I can get removed from the bathroom tonight!